Process
Areas
(staged)

Level 2
 RM
 ARD
 PP
 PMC
 AM
 SSAD
 MA
 PPQA
 CM
Level 3
 ATM
 AVER
 AVAL
 OPF
 OPD
 OT
 IPM
 RSKM
 DAR
Level 4
 OPP
 QPM
Level 5
 OID
 CAR

A  B  C  D  E  F  G  H  I  L  M  N  O  P  Q  R  S  T  U  V  W 
G

A required model component that describes characteristics that must be present to institutionalize processes that implement a process area. (See also "institutionalization.")

An expected model component that is considered important in achieving the associated generic goal. The generic practices associated with a generic goal describe the activities that are expected to result in achievement of the generic goal and contribute to the institutionalization of the processes associated with a process area.

An informative model component that appears after a generic practice to provide guidance on how the generic practice should be applied to the process area. (This model component is not present in all CMMI models.)

generic goal

General Motors

A required CMMI component that can be either a generic goal or a specific goal. The word goal in a CMMI model always refers to a model component (e.g., generic goal and specific goal). (See also "generic goal," "objective," and "specific goal.")

generic practice

Table  | Images  | Glossary  | Index  | Faceted index


Process
Areas(continuous)

Process
management  
 OPF
 OPD
 OT  
 OPP 
 OID
Project
management
 PP
 PMC
 IPM
 QPM
 RSKM
 REQM
Acquisition
 AM
 SSAD 
 ARD
 ATM
 AVER
 AVAL
Support
 CM
 PPQA
 MA
 DAR
 CAR