Process
Areas
(staged)

Level 2
 RM
 ARD
 PP
 PMC
 AM
 SSAD
 MA
 PPQA
 CM
Level 3
 ATM
 AVER
 AVAL
 OPF
 OPD
 OT
 IPM
 RSKM
 DAR
Level 4
 OPP
 QPM
Level 5
 OID
 CAR

 5.1. Appendix A: References

Ahern 2005

Ahern, Dennis M.; Armstrong, Jim; Clouse, Aaron; Ferguson, Jack R.; Hayes, Will; & Nidiffer, Kenneth E. CMMI SCAMPI Distilled: Appraisals for Process Improvement. Boston, MA: Addison-Wesley, 2005.

Bernard 2005

Bernard, Tom et al. CMMI Acquisition Module, Version 1.1. (CMU/SEI-2005-TR-011, ADA441245). Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon® University, May 2005. http://www.sei.cmu.edu/publications/documents/05.reports/05tr011.html.

Crosby 1979

Crosby, Philip B. Quality Is Free The Art of Making Quality Certain. New York: McGraw-Hill, 1979.

Curtis 2001

Curtis, Bill; Hefley, William E.; & Miller, Sally A. The People Capability Maturity Model: Guidelines for Improving the Workforce. Boston, MA: Addison-Wesley, 2001.

Deming 1986

Deming, W. Edwards. Out of the Crisis. Cambridge, MA: MIT Press, 1986.

Dodson 2006

Dodson, Kathryn M. et al. Adapting CMMI for Acquisition Organizations: A Preliminary Report (CMU/SEI-2006-SR-005, ADA453524). Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University, June 2006. http://www.sei.cmu.edu/publications/documents/06.reports/06sr005.html.

EIA 2002

Electronic Industries Alliance. Systems Engineering Capability Model (EIA/IS-731.1). Washington, DC, 2002.

EIA 2003

Electronic Industries Alliance. EIA Interim Standard: Systems Engineering (EIA/IS-632). Washington, DC, 2003.

GEIA 748 2002

Government Electronics and Information Technology Alliance. Earned Value Management Systems (ANSI/EIA-748). New York, NY, 2002. http://www.nssn.org/search/DetailResults.aspx?docid=338699.

Gibson 2006

Gibson, Diane L.; Goldenson, Dennis R.; & Kost, Keith. Performance Results of CMMI-Based Process Improvement (CMU/SEI-2006-TR-004, ADA454687). Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University, August 2006.
http://www.sei.cmu.edu/publications/documents/06.reports/06tr004.html.

Humphrey 1989

Humphrey, Watts S. Managing the Software Process. Boston, MA: Addison-Wesley, 1989.

IEEE 1991

Institute of Electrical and Electronics Engineers. IEEE Standard Computer Dictionary: A Compilation of IEEE Standard Computer Glossaries. New York, NY: IEEE, 1991.

ISO 1995

International Organization for Standardization and International Electrotechnical Commission. ISO/IEC TR 12207 Information Technology—Software Life Cycle Processes, 1995.
http://webstore.iec.ch/webstore/webstore.nsf/artnum/032910.

ISO 2000

International Organization for Standardization. ISO 9001, Quality Management Systems—Requirements, 2000.
http://www.iso.org/iso/en/CatalogueDetailPage.CatalogueDetail?CSNUMBER=21823&ICS1=3&ICS2=120&ICS3=10.

ISO 2002a

International Organization for Standardization and International Electrotechnical Commission. ISO/IEC 15288 Systems Engineering—System Life Cycle Processes, 2002.
http://www.jtc1-sc7.org/.

ISO 2002b

International Organization for Standardization and International Electrotechnical Commission. ISO/IEC 15939 Software and Systems Engineering—Measurement Process, 2002.
http://www.jtc1-sc7.org/.

ISO 2005

International Organization for Standardization and International Electrotechnical Commission. ISO/IEC 20000-1 Information Technology – Service Management, Part 1: Specification; ISO/IEC 20000-2 Information Technology – Service Management, Part 2: Code of Practice, 2005.
http://www.iso.org/iso/iso_catalogue/catalogue_tc/catalogue_detail.htm?csnumber=41333.

ISO 2006

International Organization for Standardization and International Electrotechnical Commission. ISO/IEC TR 15504 Information Technology—Software Process Assessment Part 1: Concepts and Vocabulary, Part 2: Performing an Assessment, Part 3: Guidance on Performing an Assessment, Part 4: Guidance on Use for Process Improvement and Process Capability Determination, Part 5: An Exemplar Process Assessment Model, 2003-2006. http://www.iso.org/iso/search.htm?qt=15504&published=true&active_tab=standards.

IT Governance 2005

IT Governance Institute. CobiT 4.0. Rolling Meadows, IL: IT Governance Institute, 2005. http://www.isaca.org/Content/NavigationMenu/Members_and_Leaders/COBIT6/Obtain_COBIT/Obtain_COBIT.htm.

Juran 1988

Juran, Joseph M. Juran on Planning for Quality. New York: Macmillan, 1988.

McFeeley 1996

McFeeley, Robert. IDEAL: A User’s Guide for Software Process Improvement (CMU/SEI-96-HB-001, ADA305472). Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University, February 1996.
http://www.sei.cmu.edu/publications/documents/96.reports/96.hb.001.html.

SEI 1995

Software Engineering Institute. The Capability Maturity Model: Guidelines for Improving the Software Process. Reading, MA: Addison-Wesley, 1995.

SEI 2002

Software Engineering Institute. Software Acquisition Capability Maturity Model (SA-CMM) Version 1.03 (CMU/SEI-2002-TR-010, ADA399794). Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University, March 2002.
http://www.sei.cmu.edu/publications/documents/02.reports/02tr010.html.

SEI 2006a

CMMI Product Team. CMMI for Development, Version 1.2 (CMU/SEI-2006-TR-008, ADA455858). Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University, August 2006. http://www.sei.cmu.edu/publications/documents/06.reports/06tr008.html.

SEI 2006b

SCAMPI Upgrade Team. Standard CMMI Appraisal Method for Process Improvement (SCAMPI) A, Version 1.2: Method Definition Document (CMU/SEI-2006-HB-002). Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University, August 2006. http://www.sei.cmu.edu/publications/documents/06.reports/06hb002.html.

SEI 2006c

SCAMPI Upgrade Team. Appraisal Requirements for CMMI, Version 1.2 (ARC, V1.2) (CMU/SEI-2006-TR-011, ADA454612). Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University, August 2006. http://www.sei.cmu.edu/publications/documents/06.reports/06tr011.html.

SEI 2007

CMMI Guidebook for Acquirers Team. Understanding and Leveraging a Supplier’s CMMI Efforts: A Guidebook for Acquirers (CMU/SEI-2007-TR-004). Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University, March 2007. http://www.sei.cmu.edu/publications/documents/07.reports/07tr004.html.

Shewhart 1931

Shewhart, Walter A. Economic Control of Quality of Manufactured Product. New York: Van Nostrand, 1931.

Table  | Images  | Glossary  | Index  | Faceted index


Process
Areas(continuous)

Process
management  
 OPF
 OPD
 OT  
 OPP 
 OID
Project
management
 PP
 PMC
 IPM
 QPM
 RSKM
 REQM
Acquisition
 AM
 SSAD 
 ARD
 ATM
 AVER
 AVAL
Support
 CM
 PPQA
 MA
 DAR
 CAR