Process
Areas
(staged)

Level 2
 
RM
 PP
 PMC
 SAM
 MA
 PPQA
 CM
Level 3
 
RD
 TS
 PI
 VE
 VA
 OPF
 OPD
 OT
 IPM
 RSKM
 DAR
Level 4
 
OPP
 QPM
Level 5
 
OID
 CAR

 SG 1 Prepare for Product Integration
Process AreaPI
Level3
GoalSG 1

Preparation for product integration is conducted.

Preparing for integration of product components involves establishing and maintaining an integration sequence, the environment for performing the integration, and integration procedures. The specific practices of the Prepare for Product Integration specific goal build on each other in the following way. The first specific practice determines the sequence for product and product component integration. The second determines the environment that will be used to carry out the product and product component integration. The third develops procedures and criteria for product and product component integration. Preparation for integration starts early in the project and the integration sequence is developed concurrently with the practices in the Technical Solution process area.

Table  | Images  | Glossary  | Index  | Faceted index


Process
Areas
(continuous)


Process
management  
 
OPF
 OPD
 OT  
 
OPP 
 
OID
Project
management
 
PP
 PMC
 SAM 
 
IPM
 RSKM
 
QPM
Engineering
 
RD
 RM
 TS
 PI
 VE
 VA
Support
 
CM
 PPQA
 MA
 
DAR
 CAR