Process
Areas
(staged)

Level 2
 
RM
 PP
 PMC
 SAM
 MA
 PPQA
 CM
Level 3
 
RD
 TS
 PI
 VE
 VA
 OPF
 OPD
 OT
 IPM
 RSKM
 DAR
Level 4
 
OPP
 QPM
Level 5
 
OID
 CAR

 GP 2.6 Manage Configurations
Process AreaIPM
Level3
GoalGG 2
PracticeGP 2.6

Place designated work products of the integrated project management process under appropriate levels of control.

Elaboration:

Examples of work products placed under control include the following:

·   The project’s defined process

·   Project plans

·   Other plans that affect the project

·   Integrated plans

·   Actual process and product measures collected from the project

  

  

IPPD Addition

Examples of work products placed under control also include the following:

·   Project's shared vision

·   Integrated team structure

·   Integrated team charters

Table  | Images  | Glossary  | Index  | Faceted index


Process
Areas
(continuous)


Process
management  
 
OPF
 OPD
 OT  
 
OPP 
 
OID
Project
management
 
PP
 PMC
 SAM 
 
IPM
 RSKM
 
QPM
Engineering
 
RD
 RM
 TS
 PI
 VE
 VA
Support
 
CM
 PPQA
 MA
 
DAR
 CAR