 SP 3.3 Evaluate Assembled Product Components
Process AreaPI
Level3
GoalSG 3
PracticeSP 3.3

Evaluate assembled product components for interface compatibility.

Refer to the Verification process area for more information about verifying assembled product components.

Refer to the Validation process area for more information about validating assembled product components.

This evaluation involves examining and testing assembled product components for performance, suitability, or readiness using the available procedures and environment. It is performed as appropriate for different stages of assembly of product components as identified in the product integration sequence and available procedures. The product integration sequence and available procedures may define a more refined integration and evaluation sequence than might be envisioned just by examining the product architecture. For example, if an assembly of product components is composed of four less complex product components, the integration sequence will not necessarily call for the simultaneous integration and evaluation of the four units as one. Rather, the four less complex units may be integrated progressively, one at a time, with an evaluation after each assembly operation prior to realizing the more complex product component that matched the specification in the product architecture. Alternatively, the product integration sequence and available procedures could have determined that only a final evaluation was the best one to perform.

Typical Work Products

1.    Exception reports

2.    Interface evaluation reports

3.    Product integration summary reports

Subpractices

1.    Conduct the evaluation of assembled product components following the product integration sequence and available procedures.

2.    Record the evaluation results.

Example results include the following:

·   Any adaptation required to the integration procedure

·   Any change to the product configuration (spare parts, new release)

·   Evaluation procedure deviations

Table  | Images  | Glossary  | Index  | Faceted index


Process
Areas
(continuous)


Process
management  
 
OPF
 OPD
 OT  
 
OPP 
 
OID
Project
management
 
PP
 PMC
 SAM 
 
IPM
 RSKM
 
QPM
Engineering
 
RD
 RM
 TS
 PI
 VE
 VA
Support
 
CM
 PPQA
 MA
 
DAR
 CAR