Process
Areas
(staged)

Level 2
 
RM
 PP
 PMC
 SAM
 MA
 PPQA
 CM
Level 3
 
RD
 TS
 PI
 VE
 VA
 OPF
 OPD
 OT
 IPM
 RSKM
 DAR
Level 4
 
OPP
 QPM
Level 5
 
OID
 CAR

 GP 2.8 Monitor and Control the Process
Process AreaPMC
Level2
GoalGG 2
PracticeGP 2.8

Monitor and control the project monitoring and control process against the plan for performing the process and take appropriate corrective action.

Elaboration:

Refer to Table 6.2 on page 95 in Generic Goals and Generic Practices for more information about the relationship between generic practice 2.8 and the Project Monitoring and Control process area.

  

Examples of measures and work products used in monitoring and controlling include the following:

·   Number of open and closed corrective actions

·   Schedule with status for monthly financial data collection, analysis, and reporting

·   Number and types of reviews performed

·   Review schedule (planned versus actual and slipped target dates)

·   Schedule for collection and analysis of monitoring data

Table  | Images  | Glossary  | Index  | Faceted index


Process
Areas
(continuous)


Process
management  
 
OPF
 OPD
 OT  
 
OPP 
 
OID
Project
management
 
PP
 PMC
 SAM 
 
IPM
 RSKM
 
QPM
Engineering
 
RD
 RM
 TS
 PI
 VE
 VA
Support
 
CM
 PPQA
 MA
 
DAR
 CAR