Process
Areas
(staged)

Level 2
 
RM
 PP
 PMC
 SAM
 MA
 PPQA
 CM
Level 3
 
RD
 TS
 PI
 VE
 VA
 OPF
 OPD
 OT
 IPM
 RSKM
 DAR
Level 4
 
OPP
 QPM
Level 5
 
OID
 CAR

 GP 2.3 Provide Resources
Process AreaTS
Level3
GoalGG 2
PracticeGP 2.3

Provide adequate resources for performing the technical solution process, developing the work products, and providing the services of the process.

Elaboration:

Special facilities may be required for developing, designing, and implementing solutions to requirements. When necessary, the facilities required for the activities in the Technical Solution process area are developed or purchased.

  

Examples of other resources provided include the following tools:

·   Design specification tools

·   Simulators and modeling tools

·   Prototyping tools

·   Scenario definition and management tools

·   Requirements tracking tools

·   Interactive documentation tools

Table  | Images  | Glossary  | Index  | Faceted index


Process
Areas
(continuous)


Process
management  
 
OPF
 OPD
 OT  
 
OPP 
 
OID
Project
management
 
PP
 PMC
 SAM 
 
IPM
 RSKM
 
QPM
Engineering
 
RD
 RM
 TS
 PI
 VE
 VA
Support
 
CM
 PPQA
 MA
 
DAR
 CAR