Process
Areas
(staged)

Level 2
 
RM
 PP
 PMC
 SAM
 MA
 PPQA
 CM
Level 3
 
RD
 TS
 PI
 VE
 VA
 OPF
 OPD
 OT
 IPM
 RSKM
 DAR
Level 4
 
OPP
 QPM
Level 5
 
OID
 CAR

 Configuration Control Board

The Configuration Control Board has been the official mechanism for controlling changes to the version 1.2 CMMI for Development models. This group was responsible for product integrity by reviewing all changes to the baselines and approving only changes that met the criteria for version 1.2.

·         Atkinson, Shane (Borland/TeraQuest)

·         Bate, Roger (Software Engineering Institute)

·         Bernard, Tom (U.S. Air Force)

·         Chrissis, Mary Beth (Software Engineering Institute)

·         Croll, Paul (Computer Sciences Corporation)

·         Gristock, Stephen (JPMorganChase)

·         Hefner, Rick (Northrop Grumman Corporation)

·         Jacobsen, Nils (Motorola)

·         Konrad, Mike (Software Engineering Institute)[1]

·         Osiecki, Lawrence (U.S.Army)

·         Peterson, Bill (Software Engineering Institute)

·         Phillips, Mike (Software Engineering Institute)

·         Rassa, Bob (Raytheon)

·         Richter, Karen (Institute for Defense Analyses)

·         Sapp, Millee (U.S. Air Force)

·         Schoening, Bill (Boeing and INCOSE)

·         Schwomeyer, Warren (Lockheed Martin)

·         Smith, Katie (U.S.Navy)

·         Wolf, Gary (Raytheon)

·         Brown, Rhonda (Software Engineering Institute)

·         Shrum, Sandy (Software Engineering Institute)



[1]Configuration Control Board Chair

Table  | Images  | Glossary  | Index  | Faceted index


Process
Areas
(continuous)


Process
management  
 
OPF
 OPD
 OT  
 
OPP 
 
OID
Project
management
 
PP
 PMC
 SAM 
 
IPM
 RSKM
 
QPM
Engineering
 
RD
 RM
 TS
 PI
 VE
 VA
Support
 
CM
 PPQA
 MA
 
DAR
 CAR