Process
Areas
(staged)

Level 2
 
RM
 PP
 PMC
 SAM
 MA
 PPQA
 CM
Level 3
 
RD
 TS
 PI
 VE
 VA
 OPF
 OPD
 OT
 IPM
 RSKM
 DAR
Level 4
 
OPP
 QPM
Level 5
 
OID
 CAR

 SP 3.5 Validate Requirements
Process AreaRD
Level3
GoalSG 3
PracticeSP 3.5

Validate requirements to ensure the resulting product will perform as intended in the user's environment.

Requirements validation is performed early in the development effort with end users to gain confidence that the requirements are capable of guiding a development that results in successful final validation. This activity should be integrated with risk management activities. Mature organizations will typically perform requirements validation in a more sophisticated way using multiple techniques and will broaden the basis of the validation to include other stakeholder needs and expectations.

Examples of techniques used for requirements validation include the following:

·   Analysis

·   Simulations

·   Prototyping

·   Demonstrations

  

Typical Work Products

1.    Record of analysis methods and results

Subpractices

1.    Analyze the requirements to determine the risk that the resulting product will not perform appropriately in its intended-use environment.

2.    Explore the adequacy and completeness of requirements by developing product representations (e.g., prototypes, simulations, models, scenarios, and storyboards) and by obtaining feedback about them from relevant stakeholders.

Refer to the Validation process area for information about preparing for and performing validation on products and product components.

3.    Assess the design as it matures in the context of the requirements validation environment to identify validation issues and expose unstated needs and customer requirements.

Table  | Images  | Glossary  | Index  | Faceted index


Process
Areas
(continuous)


Process
management  
 
OPF
 OPD
 OT  
 
OPP 
 
OID
Project
management
 
PP
 PMC
 SAM 
 
IPM
 RSKM
 
QPM
Engineering
 
RD
 RM
 TS
 PI
 VE
 VA
Support
 
CM
 PPQA
 MA
 
DAR
 CAR