Process
Areas
(staged)

Level 2
 
RM
 PP
 PMC
 SAM
 MA
 PPQA
 CM
Level 3
 
RD
 TS
 PI
 VE
 VA
 OPF
 OPD
 OT
 IPM
 RSKM
 DAR
Level 4
 
OPP
 QPM
Level 5
 
OID
 CAR

 SG 1 Select Product Component Solutions
Process AreaTS
Level3
GoalSG 1

Product or product component solutions are selected from alternative solutions.

Alternative solutions and their relative merits are considered in advance of selecting a solution. Key requirements, design issues, and constraints are established for use in alternative solution analysis. Architectural features that provide a foundation for product improvement and evolution are considered. Use of commercial off-the-shelf (COTS) product components are considered relative to cost, schedule, performance, and risk. COTS alternatives may be used with or without modification. Sometimes such items may require modifications to aspects such as interfaces or a customization of some of the features to better achieve product requirements.

One indicator of a good design process is that the design was chosen after comparing and evaluating it against alternative solutions. Decisions on architecture, custom development versus off the shelf, and product component modularization are typical of the design choices that are addressed. Some of these decisions may require the use of a formal evaluation process.

Refer to the Decision Analysis and Resolution process area for more information about the use of a formal evaluation process.

Sometimes the search for solutions examines alternative instances of the same requirements with no allocations needed for lower level product components. Such is the case at the bottom of the product architecture. There are also cases where one or more of the solutions are fixed (e.g., a specific solution is directed or available product components, such as COTS, are investigated for use).

In the general case, solutions are defined as a set. That is, when defining the next layer of product components, the solution for each of the product components in the set is established. The alternative solutions are not only different ways of addressing the same requirements, but they also reflect a different allocation of requirements among the product components comprising the solution set. The objective is to optimize the set as a whole and not the individual pieces. There will be significant interaction with processes associated with the Requirements Development process area to support the provisional allocations to product components until a solution set is selected and final allocations are established.

Product-related lifecycle processes are among the product component solutions that are selected from alternative solutions. Examples of these product-related lifecycle processes are the manufacturing, delivery, and support processes.

Table  | Images  | Glossary  | Index  | Faceted index


Process
Areas
(continuous)


Process
management  
 
OPF
 OPD
 OT  
 
OPP 
 
OID
Project
management
 
PP
 PMC
 SAM 
 
IPM
 RSKM
 
QPM
Engineering
 
RD
 RM
 TS
 PI
 VE
 VA
Support
 
CM
 PPQA
 MA
 
DAR
 CAR