Process
Areas
(staged)

Level 2
 
RM
 PP
 PMC
 SAM
 MA
 PPQA
 CM
Level 3
 
RD
 TS
 PI
 VE
 VA
 OPF
 OPD
 OT
 IPM
 RSKM
 DAR
Level 4
 
OPP
 QPM
Level 5
 
OID
 CAR

 Publicly Available Sources

Ahern 2003

Ahern, Dennis M.; Clouse, Aaron; & Turner, Richard. CMMI Distilled: A Practical Introduction to Integrated Process Improvement, Second Edition. Boston: Addison-Wesley, 2003.

Ahern 2005

Ahern, Dennis M.; Armstrong, Jim; Clouse, Aaron; Ferguson, Jack R.; Hayes, Will; & Nidiffer, Kenneth E. CMMI SCAMPI Distilled: Appraisals for Process Improvement. Boston: Addison-Wesley, 2005.

Chrissis 2003

Chrissis, Mary Beth; Konrad, Mike; & Shrum, Sandy. CMMI: Guidelines for Process Integration and Product Improvement. Boston: Addison-Wesley, 2003.

Crosby 1979

Crosby, Philip B. Quality Is Free The Art of Making Quality Certain. New York: McGraw-Hill, 1979.

Curtis 2002

Curtis, Bill; Hefley, William E.; & Miller, Sally A. The People Capability Maturity Model Guidelines for Improving the Workforce. Boston: Addison-Wesley, 2002.

Deming 1986

Deming, W. Edwards. Out of the Crisis. Cambridge, MA: MIT Center for Advanced Engineering, 1986.

DoD 1996

Department of Defense. DoD Guide to Integrated Product and Process Development (Version 1.0). Washington, DC: Office of the Under Secretary of Defense (Acquisition and Technology), February 5, 1996.
http://www.abm.rda.hq.navy.mil/navyaos/content/download/1000/4448/file/ippdhdbk.pdf.

Dymond 2004

Dymond, Kenneth M. A Guide to the CMMI: Interpreting the Capability Maturity Model Integration. Annapolis, MD: Process Transition International Inc., 2004.

EIA 1994

Electronic Industries Alliance. EIA Interim Standard: Systems Engineering (EIA/IS-632). Washington, DC, 1994.

EIA 1998

Electronic Industries Alliance. Systems Engineering Capability Model (EIA/IS-731). Washington, DC, 1998;
(Note: This model has been retired by EIA.)

GEIA 2004

Government Electronic Industries Alliance. Data Management (GEIA-859). Washington, DC, 2004.
http://webstore.ansi.org/ansidocstore/product.asp?sku=GEIA-859-2004.

Gibson 2006

Gibson, Diane L.; Goldenson, Dennis R. & Kost, Keith. Performance Results of CMMI-Based Process Improvement. (CMU/SEI-2006-TR-004, ESC-TR-2006-004). Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University, August 2006.
http://www.sei.cmu.edu/publications/documents/06.reports/06tr004.html.

Humphrey 1989

Humphrey, Watts S. Managing the Software Process. Reading, MA: Addison-Wesley, 1989.

IEEE 1990

Institute of Electrical and Electronics Engineers. IEEE Standard Computer Dictionary: A Compilation of IEEE Standard Computer Glossaries. New York: IEEE, 1990.

ISO 1987

International Organization for Standardization. ISO 9000: International Standard. 1987.
http://www.iso.ch/.

ISO 1995

International Organization for Standardization and International Electrotechnical Commission. ISO/IEC TR 12207 Information Technology-Software Life Cycle Processes, 1995.
http://www.jtc1-sc7.org.

ISO 1998

International Organization for Standardization and International Electrotechnical Commission. ISO/IEC TR 15504 Information Technology-Software Process Assessment, 1998.
http://www.iso.ch/.

ISO 2000

International Organization for Standardization. ISO 9001, Quality Management Systems-Requirements, 2000.
http://www.iso.ch/.

ISO 2002a

International Organization for Standardization and International Electrotechnical Commission. ISO/IEC 15939 Software Engineering-Software Measurement Process, 2002.
http://www.iso.ch/.

ISO 2002b

International Organization for Standardization and International Electrotechnical Commission. ISO/IEC 15288 Systems Engineering-System Life Cycle Processes, 2002.
http://www.jtc1-sc7.org/.

ISO 2006

International Organization for Standardization and International Electrotechnical Commission. ISO/IEC TR 15504 Information Technology-Software Process Assessment Part 1: Concepts and Vocabulary, Part 2: Performing an Assessment, Part 3: Guidance on Performing an Assessment, Part 4: Guidance on Use for Process Improvement and Process Capability Determination, Part 5: An Exemplar Process Assessment Model, 2003-2006.
http://www.jtc1-sc7.org/.

Juran 1988

Juran, Joseph M. Juran on Planning for Quality. New York: Macmillan, 1988.

McGarry 2000

McGarry, John; Card, David; Jones, Cheryl; Layman, Beth; Clark, Elizabeth; Dean, Joseph; & Hall, Fred. Practical Software Measurement: Objective Information for Decision Makers. Boston: Addison-Wesley, 2002.

SEI 1995

Software Engineering Institute. The Capability Maturity Model: Guidelines for Improving the Software Process. Reading, MA: Addison-Wesley, 1995.

SEI 1997a

Integrated Product Development Capability Maturity Model, Draft Version 0.98. Pittsburgh, PA: Enterprise Process Improvement Collaboration and Software Engineering Institute, Carnegie Mellon University, July 1997.
(Note: This model was never officially released and is no longer publicly available.)

SEI 1997b

Software Engineering Institute. Software CMM, Version 2.0 (Draft C), October 22, 1997.
(Note: This model was never officially released and is no longer publicly available.)

SEI 2001

Paulk, Mark C. & Chrissis, Mary Beth. The 2001 High Maturity Workshop (CMU/SEI-2001-SR-014). Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University, January 2002.
http://www.sei.cmu.edu/publications/documents/01.reports/01sr014.html.

SEI 2002a

CMMI Product Development Team. CMMI for Systems Engineering/Software Engineering/Integrated Product and Process Development/Supplier Sourcing, Version 1.1 Staged Representation (CMU/SEI-2002-TR-012, ESC-TR-2002-012). Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University, March 2002.
http://www.sei.cmu.edu/publications/documents/02.reports/02tr012.html.

SEI 2002b

CMMI Product Development Team. CMMI for Systems Engineering/Software Engineering/Integrated Product and Process Development/Supplier Sourcing, Version 1.1 Continuous Representation (CMU/SEI-2002-TR-011, ESC-TR-2002-011). Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University, March 2002.
http://www.sei.cmu.edu/publications/documents/02.reports/02tr011.html.

SEI 2002c

Software Engineering Institute. Software Acquisition Capability Maturity Model (SA-CMM) Version 1.03 (CMU/SEI-2002-TR-010, ESC-TR-2002-010). Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University, March 2002.
http://www.sei.cmu.edu/publications/documents/02.reports/02tr010.html.

SEI 2004

Software Engineering Institute. CMMI A-Specification, Version 1.6.
http://www.sei.cmu.edu/cmmi/background/aspec.html (February 2004).

SEI 2005

Software Engineering Institute. CMMI Acquisition Module (CMMI-AM) Version 1.1 (CMU/SEI-2005-TR-011). Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University, May 2005.
http://www.sei.cmu.edu/publications/documents/05.reports/05tr011/05tr011.html.

SEI 2006a

CMMI Product Development Team. ARC v1.2, Appraisal Requirements for CMMI, Version 1.2 (CMU/SEI-2006-TR-011). Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University, July 2006.
http://www.sei.cmu.edu/publications/documents/01.reports/06tr011.html.

SEI 2006b

CMMI Product Development Team. SCAMPI v1.2, Standard CMMI Appraisal Method for Process Improvement, Version 1.2: Method Definition Document (CMU/SEI-2006-HB-002). Pittsburgh, PA: Software Engineering Institute, Carnegie Mellon University, July 2006.
http://www.sei.cmu.edu/publications/documents/06.reports/06hb002.html.

Shewhart 1931

Shewhart, Walter A. Economic Control of Quality of Manufactured Product. New York: Van Nostrand, 1931.

Table  | Images  | Glossary  | Index  | Faceted index


Process
Areas
(continuous)


Process
management  
 
OPF
 OPD
 OT  
 
OPP 
 
OID
Project
management
 
PP
 PMC
 SAM 
 
IPM
 RSKM
 
QPM
Engineering
 
RD
 RM
 TS
 PI
 VE
 VA
Support
 
CM
 PPQA
 MA
 
DAR
 CAR