Process
Areas
(staged)

Level 2
 RM
 ARD
 PP
 PMC
 AM
 SSAD
 MA
 PPQA
 CM
Level 3
 ATM
 AVER
 AVAL
 OPF
 OPD
 OT
 IPM
 RSKM
 DAR
Level 4
 OPP
 QPM
Level 5
 OID
 CAR

A  B  C  D  E  F  G  H  I  L  M  N  O  P  Q  R  S  T  U  V  W 
N
GP 4.1 Establish Quantitative Objectives for the Process (GG 4 Institutionalize a Quantitatively Managed Process)
GP 4.2 Stabilize Subprocess Performance (GG 4 Institutionalize a Quantitatively Managed Process)
natural bounds (Appendix D: Glossary)
Organizational Process Performance (Generic Goals and Generic Practices, and the Process Areas)
Quantitatively Managed Process (Process Institutionalization)
SP 1.3 Establish Quality and Process-Performance Objectives (SG 1 Establish Performance Baselines and Models)
SP 1.4 Establish Process-Performance Baselines (SG 1 Establish Performance Baselines and Models)
SP 2.2 Apply Statistical Methods to Understand Variation (SG 2 Statistically Manage Subprocess Performance)
SP 2.3 Monitor Performance of the Selected Subprocesses (SG 2 Statistically Manage Subprocess Performance)
NDIA (Appendix B: Acronyms)
nondevelopmental item (Appendix D: Glossary)
nontechnical requirements (Appendix D: Glossary)
SP 1.2 Estimate the Scope of the Project (SG 1 Establish Estimates)
contractual requirements (Appendix D: Glossary)
nontechnical requirements (Appendix D: Glossary)
requirements management (Appendix D: Glossary)
Requirements Management (Generic Goals and Generic Practices, and the Process Areas)
SP 2.1 Establish Contractual Requirements (SG 2 Develop Contractual Requirements)
Table  | Images  | Glossary  | Index  | Faceted index


Process
Areas(continuous)

Process
management  
 OPF
 OPD
 OT  
 OPP 
 OID
Project
management
 PP
 PMC
 IPM
 QPM
 RSKM
 REQM
Acquisition
 AM
 SSAD 
 ARD
 ATM
 AVER
 AVAL
Support
 CM
 PPQA
 MA
 DAR
 CAR